1 / 5
| Still deciding? Get samples of $ ! US$ 0/Piece Order Sample |
| Model NO. | PD-GM-04 |
|---|---|
| Certification | CE |
| Application | Commercial |
| Material | Steel |
| Type | Ground Bracket |
| Wind Speed | 60m/S |
| Snow Load | 1.4kn/M2 |
| Lead Time | 7-15 Days |
| Surface Treatment | Magnesium Aluminum Zinc |
| Standard | AS/NZS1170/Jisc8955:2017 |
| Production Capacity | 10000 |
| Package Size | 261.00cm * 211.00cm * 193.00cm |
|---|---|
| Package Gross Weight | 19.850kg |
| Transport Package | Each Items Packed in Cartons, Several Cartons Pack |
Step 1: Installing Ground Screws. Anchor the support structure using specialized drilling equipment based on soil type.
Step 2: Install Beam and Diagonal Support. Connect the diagonal support pole to the top using bolts and nuts.
Step 3: Installing Rails. Attach the rails to the beam using brackets and bolts, ensuring they are level.
Step 4: Installing Solar Panels. Securely fasten each solar panel to the rails using mounting hardware.
| Material | Structure: Mg-Al-Zn & AL-6005-T5 (Anodized); Components: SUS304 & AI6005-5 |
|---|---|
| Application | Commercial and Residential installation |
| Tilt Angle | 0-60° |
| Wind Speed | 0-60 m/s |
| Snow Load | 0-150cm |
| Ground Clearance | 0-1m |
| Design Standard | AS/NZS 1170, DIN 1055, JIS C8955: 2017, IBC 2009 |
| Warranty | 12 years |


















WEX Medical